Tesla ordered to stop work on $4 billion Berlin Gigafactory

Tesla ordered to stop work on $4 billion Berlin Gigafactory

Replay Video

UP NEXT

  • 5 budget-friendly spring break vacations

    Students on a budget can still have a blast at these spring break destinations with affordable options for fun.

    Buzz60 LogoBuzz60
  • a man sitting at a table using a laptop

    Why filing taxes in 2020 might be tougher than usual

    While tax season is known to be “taxing” on one’s sanity, filing this year might be a bit more tricky. Here’s why.

    GOBankingRates LogoGOBankingRates
  • a man sitting in a dark room

    7 ugly truths about retirement

    When it comes to your retirement, expect the unexpected. Especially when it comes to your finances. The most prepared person could be caught off guard with expenses in their golden years, expenses that many don’t consider until it’s too late.

    GOBankingRates LogoGOBankingRates

SETTINGS

OFF

HD

HQ

SD

LO

UP NEXT

UP NEXT

Video by Bloomberg

APPLE INC.

324.95

+0.08

+0.02%

CONSTELLATION BRANDS, INC.

203.83

+2.64

+1.31%

TESLA, INC.

800.03

-3.97

-0.49%

AMAZON.COM, INC.

2,134.87

-15.00

-0.70%

Tesla’s plans for a European Gigafactory hit a speedbump over the weekend.

A German court ruled on Saturday that Tesla must temporarily halt the deforestation that was underway to make space for its new Gigafactory manufacturing plant while it considers objections from environmental group Grüne Liga (Green League).

Tesla CEO Elon Musk announced the plans for the 300-hectare site in November last year, and Tesla says on its website it aims to begin production in 2021. The German newspaper Frankfurter Allgemeine Zeitung reported that Tesla will invest up to €4 billion ($4.3 billion) into the Gigafactory.

The BBC reports Tesla had not yet been granted permission to build the factory, but had been given permission to make site preparations at its own risk.

“The Tesla plant has not yet been approved, and there is a legal requirement for an early release of the building specifications which clearly hasn’t been met in this case,” said Dirk Tessmer, the lawyer for Grüne Liga who brought the case, in a statement. Grüne Liga contests the factory could threaten the area’s drinking water. 

“This ruling shows Tesla is not above the law,” added local Grüne Liga chair Heinz-Herwig Mascher. The court is expected to reach a decision on Friday, Die Welt reports.

Local activists have also voiced concerns that the deforestation could threaten local wildlife, including a particularly vulnerable species of bat.

On its website, Tesla says it plans to replant an area three times as large as the factory site. “We are also working to ensure plenty of clean drinking water through water-saving measures in the factory as well as a structural solution with and for the community in the medium term,” it says.  a man holding a sign© REUTERS/Pawel Kopczynski/File Photo

Tesla declined to comment on the court ruling when contacted by Business Insider.


Source : Link

Follow 3-www.NET
Follow
e-News.US
  
Share
e-News.Us

Category Latest Posts